Answers for plant, quality and IT teams

The questions that come up in every first conversation, answered without marketing hedging.

About the product

  • No. Footeon is a software and factory-edge autonomy layer that sits on top of the machines you already run. We connect over OPC UA, MQTT, Modbus TCP and vendor SDKs, read sensors and vision, and write setpoints back through the controls you already trust — with approval gates on any validated parameter.

Getting it running

  • A typical wedge deployment on one line runs six to ten weeks: two weeks of sensing and baseline capture, three to five weeks of shadow-mode model tuning against your material lots, then graduated autonomy. Whole-factory rollouts follow line by line.

Pricing and coverage

  • Line at $8,000 per line per month for one workflow, Factory at $55,000 per month for the whole loop, and Enterprise from $350k to $4M ACV for multi-site networks with custom material, last and bond models. Outcome-based components are available on leather waste, rework and returns.

Most questions are really about this picture

What the agents do, where a human sits, and what gets logged.

RUN-4417 · Velo Trainer 2 · Line B · plant HCMC-03agent graph
Twin simulate — Yield-and-Energy — SUCCEEDED Twin simulate twin.simulate_run ✓ SUCCEEDED Cut and nest — Cut-and-Nest — SUCCEEDED Cut and nest cut.nest_optimize ✓ SUCCEEDED Stitch upper — Stitch-and-Upper — SUCCEEDED Stitch upper stitch.tension_control ✓ SUCCEEDED Mould sole — Mold-and-Sole — SUCCEEDED Mould sole mold.density_control ✓ SUCCEEDED Last upper — Last-and-Bond — SUCCEEDED Last upper last.fit_control ✓ SUCCEEDED Bond sole — Last-and-Bond — APPROVAL Bond sole bond.window_control ! APPROVAL Inspect pair — Quality-and-Fit — SUCCEEDED Inspect pair quality.inspect ✓ SUCCEEDED Finish and pack — Robot-and-Assembly — SUCCEEDED Finish and pack robot.finish_pack ✓ SUCCEEDED
View as table
Text equivalent — nodes, owning agent, dependency and status
#NodeAgentDepends onStatus
01 Twin simulate Yield-and-Energy — SUCCEEDED
02 Cut and nest Cut-and-Nest Twin simulate SUCCEEDED
03 Stitch upper Stitch-and-Upper Cut and nest SUCCEEDED
04 Mould sole Mold-and-Sole Stitch upper SUCCEEDED
05 Last upper Last-and-Bond Mould sole SUCCEEDED
06 Bond sole Last-and-Bond Last upper APPROVAL
07 Inspect pair Quality-and-Fit Bond sole SUCCEEDED
08 Finish and pack Robot-and-Assembly Inspect pair SUCCEEDED

Short questions, short answers

The ones that do not need a paragraph.

Operations

  • Can it run offline? Yes — edge units operate standalone and reconcile on reconnect.
  • Does it need new machines? No.
  • Does it work across shifts? Yes, including per-shift material drift.
  • Can operators override? Always, and the override is logged.

Technical

  • Which protocols? OPC UA, MQTT, Modbus TCP and vendor SDKs.
  • Cloud required? No, on-prem is supported end to end.
  • Latency? 50–100 ms station decisions on supported hardware.
  • Rollback? One command, per line.

How Footeon differs from what you already have

The three things plants usually compare us against.

Footeon versus adjacent categories
CapabilityMES / plant analyticsSingle-station vendor softwareFooteon
Sees every pairNo — batch recordsOnly its own stationYes, every pair, every station
Writes setpointsRarelyIts own machine onlyAcross the loop, with approvals
Understands constructionNoPartiallyYes — cemented, injected, vulcanised, direct-attach
Simulates before the runNoNoYes — shoe-and-line twin
Audit trail for autonomyNoMachine logs onlyImmutable, evidenced, exportable
Improves with your dataNoRarelyYes — per-factory models and craft memory

“What actually happens when the agent is unsure?”

The most common question, answered with a real trace rather than a promise.

  1. Detect Confidence or process margin falls below threshold

    Either the model is uncertain or the predicted process margin is thin — both are treated as reasons to stop.

  2. Hold The agent holds the last known-good recipe

    It never guesses forward on a validated parameter. Throughput may suffer; quality does not.

  3. Escalate Approval request with evidence attached

    Sensor series, datasheet clause and twin prediction are packaged for the responsible role, with an SLA.

  4. Record Everything is written to the audit trail

    Including the case where a human declined the change and the line ran at the previous setting.

Why traces matter

Every Footeon decision that touches a cut, a mould, a last or a bond line is recorded as plan, thought, action and observation — with the material lot, sensor reading and spec clause that justified it. Quality engineers can replay any pair.

Traces are retained for the full product-liability window and exported to your MES and quality system.

Answers in numeric form

The figures that come up most often.

  • +8.3 points of leather yield on defect-aware nesting
  • −71% delamination-driven returns after bond-window control
  • 98.2% first-pass yield across inspected pairs
  • −46% changeover time between models and colourways

What to do next depending on your role

Three different next steps.

Operations lead

Book the free two-week assessment on your worst line and get a measured baseline. Request it →

Quality director

Ask for a sample brand-auditor export and the approval policy documentation. Security →

IT and OT lead

Start with the security pack and the OT network preparation guide. Resources →

What other plants concluded

Three teams who asked these same questions.

“The nesting agent found yield our best pattern cutter could not — and then explained the layout hide by hide. We stopped arguing about scrap and started managing it.”
Head of Cutting Operations · Andean Footwear Co. [Illustrative]

Leather yield 79.1% → 87.4%

“Bonding is where our warranty costs live. Having an agent watch humidity, primer flash-off and press pressure on every pair — and stop for a human when it wants to move a validated parameter — is the first thing that has actually moved delamination.”
Quality Director · Verta Sportswear [Illustrative]

Delamination returns −71%

“We run 40 model changeovers a month. Simulating the nest, the mould recipe and the bond window in the twin before the line starts took hours out of every launch.”
Plant Manager · Đông Nam Footwear [Illustrative]

Changeover time −46%

Design-partner scenarios are illustrative and modelled on public footwear-manufacturing benchmarks — named references are [PLACEHOLDER] pending customer approval.

Not answered here?

Send the question. If it comes up twice, it ends up on this page.